Description
- Construction of OSBL facilities , pipe rack, pipe sleepers, roads, paving, electrical cable trench, culverts, pumps & equipment foundations, DM water tank foundations, fire water line, dyke wall, extension of substation building, control room (SRR), GT area structure, GT hall, BFP house, Dearator structure, compound wall, etc.
- Excavation 87000 M3, Rubber soling 11000M3, Structural steel with Painting 8800 MT, Reinforcement 2075 MT, PCC & RCC 20550 M3.